{"id":15146,"date":"2026-05-15T12:49:15","date_gmt":"2026-05-15T10:49:15","guid":{"rendered":"https:\/\/www.layher.ci\/layher-maroc-scaffolding-at-the-top-a-major-contribution-to-the-mohammed-vi-tower\/"},"modified":"2026-05-15T13:10:42","modified_gmt":"2026-05-15T11:10:42","slug":"layher-maroc-scaffolding-at-the-top-a-major-contribution-to-the-mohammed-vi-tower","status":"publish","type":"post","link":"https:\/\/www.layher.ci\/en\/layher-maroc-scaffolding-at-the-top-a-major-contribution-to-the-mohammed-vi-tower\/","title":{"rendered":"Layher Maroc Scaffolding at the top: a major contribution to the Mohammed VI Tower"},"content":{"rendered":"\n<p>Rabat&#8217;s urban landscape has been enriched by an icon: the Tour Mohammed VI. At 250 metres and 55 storeys high, it is now the tallest tower in the country. We are honored to have contributed <a href=\"https:\/\/www.layher.ci\/en\/scaffolding\/\" data-type=\"link\" data-id=\"https:\/\/www.layher.ci\/en\/scaffolding\/\">our scaffolding solution<\/a>s to this extraordinary architectural challenge.<\/p>\n\n\n\n<p>We focused on two main areas:<\/p>\n\n\n\n<p><strong>Precision logistics for interior work<\/strong> We deployed almost <strong>14 tonnes<\/strong> of equipment for the finishing work (painting, electricity, BA13, etc.). The use of <a href=\"https:\/\/www.layher.ci\/en\/rolling-scaffolding-and-ladders\/\" data-type=\"link\" data-id=\"https:\/\/www.layher.ci\/en\/rolling-scaffolding-and-ladders\/\">our <strong>mobile LW<\/strong><\/a><strong> (LightWeight)<\/strong> and <strong>ALU towers<\/strong> ensured optimum mobility and safety for the teams on site.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img fetchpriority=\"high\" decoding=\"async\" width=\"576\" height=\"1024\" src=\"https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-05-at-10.10.14-576x1024.jpeg\" alt=\"\" class=\"wp-image-15134\" style=\"width:357px;height:auto\" srcset=\"https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-05-at-10.10.14-576x1024.jpeg 576w, https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-05-at-10.10.14-169x300.jpeg 169w, https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-05-at-10.10.14.jpeg 581w\" sizes=\"(max-width: 576px) 100vw, 576px\" \/><\/figure>\n\n\n\n<p><strong>The technical challenge of the Tower&#8217;s &#8220;Coiffe&#8221;<\/strong> It was at the top of the building that our expertise was most in demand. The fitting-out of the cap was carried out in two strategic phases: <\/p>\n\n\n\n<ol start=\"1\" class=\"wp-block-list\">\n<li>Installation of exterior glazing.<\/li>\n\n\n\n<li>Development of the observatory and panoramic view.<\/li>\n<\/ol>\n\n\n\n<p><strong>The key figures in this feat:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>37 tonnes<\/strong> of <a href=\"https:\/\/www.layher.ci\/en\/multidirectional-scaffolding\/\" data-type=\"link\" data-id=\"https:\/\/www.layher.ci\/en\/multidirectional-scaffolding\/\">LW equipmen<\/a>t transported to the summits.<\/li>\n\n\n\n<li><strong>Complex logistics:<\/strong> in view of the tightness of the space, the equipment was assembled progressively up to the summit.<\/li>\n\n\n\n<li><strong>Rigorous preparation:<\/strong> 5 days of preparation, including a <strong>ground assembly simulation<\/strong> to guarantee perfect execution.<\/li>\n\n\n\n<li><strong>Human performance:<\/strong> 12 days of intensive editing by our partner <strong>PDS<\/strong>, with a team of 10 editors supervised by 2 coordinators.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" width=\"576\" height=\"1024\" src=\"https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.14-5-576x1024.jpeg\" alt=\"\" class=\"wp-image-15136\" style=\"aspect-ratio:0.5625097225823179;width:323px;height:auto\" srcset=\"https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.14-5-576x1024.jpeg 576w, https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.14-5-169x300.jpeg 169w, https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.14-5-768x1365.jpeg 768w, https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.14-5-864x1536.jpeg 864w, https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.14-5.jpeg 900w\" sizes=\"(max-width: 576px) 100vw, 576px\" \/><\/figure>\n\n\n\n<p>This project once again illustrates our ability to provide lightweight, robust solutions for the most demanding environments.<\/p>\n\n\n\n<p>A big well done to all the teams and partners involved in making this new engineering milestone in <a href=\"https:\/\/www.layher.ci\/en\/morocco\/\" data-type=\"link\" data-id=\"https:\/\/www.layher.ci\/en\/morocco\/\">Morocco<\/a> a success!<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"476\" height=\"808\" data-id=\"15151\" src=\"https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/image-40-1.png\" alt=\"\" class=\"wp-image-15151\" srcset=\"https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/image-40-1.png 476w, https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/image-40-1-177x300.png 177w\" sizes=\"(max-width: 476px) 100vw, 476px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"576\" height=\"1024\" data-id=\"15141\" src=\"https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.14-3-576x1024.jpeg\" alt=\"\" class=\"wp-image-15141\" srcset=\"https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.14-3-576x1024.jpeg 576w, https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.14-3-169x300.jpeg 169w, https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.14-3-768x1365.jpeg 768w, https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.14-3-864x1536.jpeg 864w, https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.14-3.jpeg 900w\" sizes=\"(max-width: 576px) 100vw, 576px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"576\" height=\"1024\" data-id=\"15138\" src=\"https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.15-576x1024.jpeg\" alt=\"\" class=\"wp-image-15138\" srcset=\"https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.15-576x1024.jpeg 576w, https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.15-169x300.jpeg 169w, https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.15-768x1365.jpeg 768w, https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.15-864x1536.jpeg 864w, https:\/\/www.layher.ci\/wp-content\/uploads\/2026\/05\/WhatsApp-Image-2026-05-08-at-11.52.15.jpeg 900w\" sizes=\"(max-width: 576px) 100vw, 576px\" \/><\/figure>\n<\/figure>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rabat&#8217;s urban landscape has been enriched by an icon: the Tour Mohammed VI. At 250 metres and 55 storeys high, it is now the tallest tower in the country. We are honored to have contributed our scaffolding solutions to this extraordinary architectural challenge. We focused on two main areas: Precision logistics for interior work We [&hellip;]<\/p>\n","protected":false},"author":15,"featured_media":15133,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_analysis_target_kw":"","footnotes":""},"categories":[51],"tags":[],"class_list":["post-15146","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-layher-news"],"_links":{"self":[{"href":"https:\/\/www.layher.ci\/en\/wp-json\/wp\/v2\/posts\/15146","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.layher.ci\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.layher.ci\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.layher.ci\/en\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/www.layher.ci\/en\/wp-json\/wp\/v2\/comments?post=15146"}],"version-history":[{"count":3,"href":"https:\/\/www.layher.ci\/en\/wp-json\/wp\/v2\/posts\/15146\/revisions"}],"predecessor-version":[{"id":15158,"href":"https:\/\/www.layher.ci\/en\/wp-json\/wp\/v2\/posts\/15146\/revisions\/15158"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.layher.ci\/en\/wp-json\/wp\/v2\/media\/15133"}],"wp:attachment":[{"href":"https:\/\/www.layher.ci\/en\/wp-json\/wp\/v2\/media?parent=15146"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.layher.ci\/en\/wp-json\/wp\/v2\/categories?post=15146"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.layher.ci\/en\/wp-json\/wp\/v2\/tags?post=15146"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}